as promised here is a bit of a blog about the kitchen.

 

I have been living at my house for almost 2 years now and the thing that bothered me the most was the poor layout of the exisiting kitchen.. also the fact that everything was disgusting! i started saving and 22 months later.. this started:

 

started off by removing tiles / cupboards on this wall and seeing what mess there was to uncover

20121028_140510.jpg

 

mark where the 'new' door will go:

20121028_140527.jpg

 

old door location:

20121028_140537.jpg

current hall layout:

20121028_140550.jpg

20121028_140601.jpg

 

 

then we find out the ring for this side of the kitchen is exactly where the new door is going! nothing is simple is it

20121028_143616.jpg

 

everything on the door side removed:

20121103_104407.jpg

Link to comment
Share on other sites

continuing around:

20121103_104412.jpg

 

20121103_104421.jpg

 

old door out with wood surround

20121103_104423.jpg

 

let the building work commence!

 

dust sheets up to limit dust travel around the house :(

20121104_165317.jpg

20121104_165328.jpg

 

cutting out plaster:

20121104_165345.jpg

20121104_165353.jpg

 

drawings always help when your trying to find the supporting beam on the wall your just about to cut :o!!!

20121104_165404.jpg

20121104_165416.jpg

Link to comment
Share on other sites

new door way anyone???

 

20121106_190639.jpg

 

old doorway now bricked up :)

 

20121111_191851.jpg

 

laying in the new electrics:

20121111_191900.jpg

20121111_191908.jpg

 

getting father to PVA all the brickwork up ready for Mr plasterer:

20121111_191916.jpg

 

1 1/2 weeks after the plasterer did his stuff... we where still waiting for the blooming walls to dry!!!

PS: dont do this work in November!

20121117_110736.jpg

20121117_110748.jpg

20121117_110758.jpg

20121117_110810.jpg

 

apply some paint:

20121125_070918.jpg

 

and blag a mates dehumidifier to help keep water out the air :

20121125_070930.jpg

Link to comment
Share on other sites

20121125_070939.jpg

 

late night painting... ooohhh yeaaaa

20121125_070949.jpg

 

 

now with some colour....

 

20121201_163559.jpg

 

and now some cabinets!

20121201_163619.jpg

 

 

mocked up where things will go:

20121201_163630.jpg

 

the house is still a tip though :(

20121201_163642.jpg

 

 

 

there is more to come tonight / tomorrow as this is still on going.

Link to comment
Share on other sites

Nice one Adam, doing a brilliant job there. I take it you are doing most of the work then?

 

How are you coping without a kitchen for that long? When ours was done we were only really without it for a couple of days so it wasn't too bad.

Link to comment
Share on other sites

thanks guys. its been labourious, but not difficult.

 

I have done everything bar the plastering, i have done all the electrics and Gas, water & waste. they have all been checked by friends in the trade who have given me the relevent certs to say that the job was done to the latest specs, Part P etc.

 

I didnt want my wife or child to be anywhere near the house during the work, so im currently renting 2 rooms from my parents whilst i do the work.

when i did all the drilling, knocking out wall etc i remember going home and coughing up black sludge.... i should have worn a face mask!

 

im hoping to be back in this weekend, which means we would have been out the house for 1 month :o!

 

i still have these jobs to do:

Fit work surface

fit all sockets / switches

fit door & surrounds

fit cupboard doors

fit oven / splashbacks / kitchen sink & plumb all

fit washing machine / dish washer & plumb

repaint a few walls due to dinks here and there

fit coving on ceiling

fit new fridge/freezer

box in boiler.

cut worktop to fit under boiler

 

probably a few tasks i have forgotten about

clean up

fit new table

clean the house

get all the kitchen stuff out of the lounge and back in to the kitchen!

 

 

oh and the wife has not seen any of this yet :o

Link to comment
Share on other sites

plastering is a work of art that i have no patience for.... i paid £250 to get the kitchen done and the hallway wall. i also paid £60 to get the worktop professionally cut/joined.

 

i think at the moment the project is around the £2.2K mark, thats for everything to date.

Link to comment
Share on other sites

Very impressed with your work :) A blog like this will help someone one day to decide whether to do it themselves ;)

 

I had a new kitchen at my previous house and decided to remove everything myself to keep the costs down a bit. I couldn't believe how some of the cupboards were fitted to the walls, most were just hammered in with what seemed like 5 or 6 inch nails into breeze block.

Link to comment
Share on other sites

looking good

 

can i ask why you moved the doorway ?

 

all jobs are easy.......you just need to know how to do them !!

i had an advantage of working alongside many different trades, when I needed plastering done, I watched a plasterer and asked questions, tried it a few times and have always done it myself since

Link to comment
Share on other sites

sorry guys! didn't want to face the kitchen on Thursday and last night I went out on the p**s. . which I'm currently feeling a bit woosey this morning.. but hey it was self inflicted!.

 

I think I can get the kitchen sorted today... I'm missing a few doors for my 80 units but I will hopefully get these before Christmas. I have a couple more bits of stainless steel to put up too so that should make the kitchen look a bit nicer too!

Link to comment
Share on other sites

well as promised here is an update!

Sink, washing machine and dishwasher now working

20121208_194745.jpg

 

 

wall at end of room

20121208_194611.jpg

 

where oven is in and working.. cupboard under sink and to the left is still in need of tweaking so handles / 1 door hasnt been fitted:

20121208_194541.jpg

 

and where the fridge will sit.. need to put the end covers on the worktops before it goes in though, and i need to get a blanking plate for the cable joining box.

20121208_194447.jpg

Link to comment
Share on other sites

not much has happened today....

 

we purchased, measured and cut some nice wood skirting board that will match the flooring.... drilled lots of holes to mount the skirting to the wall and polyurethaned the wood skirting to protect it. I'm back at work tomorrow and the Mrs has a driving test on Tuesday so they are now again on my priority list .. I also have sheit load of uni work to get done before Thursday.... so it looks like I may not be in till next weekend! ahhh!

 

still got the stainless steel splash backs to fit behind the cooker and get the fridge back in...

 

if I can tidy up the place I could live there now... but I think it would be nicer on the Mrs if I did that for her and she moved back in to a nice clean home!

Link to comment
Share on other sites

well the Mrs driving test is today, so this evening i will be going over and doing:

Fitting all the splash backs to the wall

fixing the worktop to the cabinets

fitting the skirting boards

getting the fridge freezer fitted

 

all these 'should' allow us to start moving things back in to the kitchen and we can be in there before the weekend.

 

i miss my home... and my own comfy bed!!!!

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...