Tony Posted March 5, 2008 Author Report Share Posted March 5, 2008 You can claim compensation off BT for not connecting your line Tony. I managed to get £380 out of them for mucking me around. Make sure you check it out, I'm not too sure if it applies to business. A miracle has happened ..... According to the BT engineer there is no problem with their line, overnight the "mend it fairy" has corrected the internal fault without anyone being there..... It's amazing what they can do nowadays Typical bloody BT, make sure the ass's don't bill you for an engineer call-out to a "working" line, my friends and family have been done like that as-well. I'll watch the bill like a hawk Quote Link to comment Share on other sites More sharing options...
Tony Posted March 7, 2008 Author Report Share Posted March 7, 2008 Interesting Finally i have a go with the builders opening the side of the building for the shutter doors..... What was worrying, the people who install the shutters don't make the whole so to speak.... And obviously the builders don't make install the shutters. My fear was choreographing the two for the same day...... As things go what really happens is the builders remove all the brick work internally but leave the outer cladding on the building.... Then the shutter peeps install the doors and the builders come back to remove the cladding Quote Link to comment Share on other sites More sharing options...
Tango Posted March 7, 2008 Report Share Posted March 7, 2008 what really happens is the builders remove all the brick work internally but leave the outer cladding on the building.... Then the shutter peeps install the doors and the builders come back to remove the cladding So in the meantime anyone with a can opener can enter the building and relieve you of various pieces of equipment, as yet unpaid for plus all your new office equipment....hmmmmm Do you know anyone with a couple of large Dobermanns??? Quote Link to comment Share on other sites More sharing options...
Tony Posted March 7, 2008 Author Report Share Posted March 7, 2008 what really happens is the builders remove all the brick work internally but leave the outer cladding on the building.... Then the shutter peeps install the doors and the builders come back to remove the cladding So in the meantime anyone with a can opener can enter the building and relieve you of various pieces of equipment, as yet unpaid for plus all your new office equipment....hmmmmm Do you know anyone with a couple of large Dobermanns??? Naaaah "what you like".... From the outside everything will look the same and i won't blog it until the internal doors are fitted. Just in case though i will leave my dog "Killer" in the centre overnight Quote Link to comment Share on other sites More sharing options...
Tango Posted March 7, 2008 Report Share Posted March 7, 2008 Do you reckon that geometry ramp will fit in my new garage?? Quote Link to comment Share on other sites More sharing options...
scorps Posted March 7, 2008 Report Share Posted March 7, 2008 Who are fabricating/fitting the shutters? We supply a lot of co's with the metal. Dude open a.s.a.p my geo needs looking at Quote Link to comment Share on other sites More sharing options...
Tony Posted March 7, 2008 Author Report Share Posted March 7, 2008 Do you reckon that geometry ramp will fit in my new garage?? No mate, it waaaaaay long (apologies to our Chinese members) In fact it's in the way now since it's in the to be built reception area. Quote Link to comment Share on other sites More sharing options...
jammy Posted March 8, 2008 Report Share Posted March 8, 2008 sound's like kaos tony rich i used the m1 to get to the 25 as it is only 1 junction down and yes ive allway's been lost so when is the geo ramp bein set up then tony finnally found the problem with the mondeo >it's a mondeo, that is the problem it had 1 hell of a bent rear subframe have sorted it now but despro need to get it set up again Quote Link to comment Share on other sites More sharing options...
Tony Posted March 8, 2008 Author Report Share Posted March 8, 2008 Who are fabricating/fitting the shutters? We supply a lot of co's with the metal. Dude open a.s.a.p my geo needs looking at I'm not sure who's making the shutters?..... The doors weren't one of my shared tasks. What's up with the geo? i only set it last year Quote Link to comment Share on other sites More sharing options...
Stephen B Posted March 12, 2008 Report Share Posted March 12, 2008 Hi Tony, How are things going at WIM. Any idea when it will be opening? Steve. Quote Link to comment Share on other sites More sharing options...
scorps Posted March 12, 2008 Report Share Posted March 12, 2008 What's up with the geo? i only set it last year Left hand down. Quote Link to comment Share on other sites More sharing options...
Tony Posted March 12, 2008 Author Report Share Posted March 12, 2008 Hi Tony, How are things going at WIM. Any idea when it will be opening? Steve. Well the builders are in now removing the walls ready for the shutter doors.. Next week the mezzanine floor goes up, then the equipment can go in, so i'm hoping the end of March Quote Link to comment Share on other sites More sharing options...
scorps Posted March 12, 2008 Report Share Posted March 12, 2008 so i'm hoping the end of March ....i'll see you then. Quote Link to comment Share on other sites More sharing options...
Tony Posted March 12, 2008 Author Report Share Posted March 12, 2008 so i'm hoping the end of March ....i'll see you then. Reasonably soon.... Believe me i want it open double fast but what can i do..... Quote Link to comment Share on other sites More sharing options...
Rich Posted March 12, 2008 Report Share Posted March 12, 2008 Coming along nicely now, once everything is done how long will it take to build the geo machine? Quote Link to comment Share on other sites More sharing options...
Tony Posted March 12, 2008 Author Report Share Posted March 12, 2008 Coming along nicely now, once everything is done how long will it take to build the geo machine? The ramp will be best part of a day.... The machine is plug-in and go but we have two days training on it. Quote Link to comment Share on other sites More sharing options...
Tony Posted March 13, 2008 Author Report Share Posted March 13, 2008 The path to the side of the centre has been removed, ready for the cement tomorrow A little issue has appeared, this is the inner floor is not the same level as the exterior drive Looks like some form of run-up will need to be built. Quote Link to comment Share on other sites More sharing options...
Tony Posted March 14, 2008 Author Report Share Posted March 14, 2008 The concrete is down.... Once this dries then i can have the markings put on. At the same time we paid to have the post put back Also a partition have been built to stop people wandering to the upstairs offices Quote Link to comment Share on other sites More sharing options...
Rich Posted March 17, 2008 Report Share Posted March 17, 2008 How's it coming along Tony, have they started the mezzanine yet? Quote Link to comment Share on other sites More sharing options...
Tony Posted March 17, 2008 Author Report Share Posted March 17, 2008 How's it coming along Tony, have they started the mezzanine yet? Nope... It's now booked for the 31st...... Shutters doors should be in soon and the materials for the reception are being built.... Machinery goes in on the 7th.... Again all booked. Quote Link to comment Share on other sites More sharing options...
Rich Posted March 17, 2008 Report Share Posted March 17, 2008 Seems to be taking alot longer than you expected then Quote Link to comment Share on other sites More sharing options...
Tony Posted March 17, 2008 Author Report Share Posted March 17, 2008 Seems to be taking alot longer than you expected then I'm agrivated to the max.... Poxy builders!! Quote Link to comment Share on other sites More sharing options...
Rich Posted March 17, 2008 Report Share Posted March 17, 2008 I can imagine Quote Link to comment Share on other sites More sharing options...
Tony Posted March 20, 2008 Author Report Share Posted March 20, 2008 Finally week commencing the 31st March..... Mezzanine floor goes up Reception will be built Both shutter doors installed and exterior wall removed Both two poster ramps installed Electric main installed Air ring main installed Equipment goes in on the 7th including building the Geo ramp/machine so we are finally getting there Quote Link to comment Share on other sites More sharing options...
scorps Posted March 20, 2008 Report Share Posted March 20, 2008 The 7th of what?..... Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.